Please identify yourself to establish authorization parameters with the log tracking grid.
VERSION 2.2
โ Add New Part
โ Add New Asset
Muir PowerSync
STATUS
0
Pending Sync
0
Total Stored
Muir PowerSync logs every genset, powerpack, and fuel tank visit in one place โ works with no signal, syncs when you're back online, and keeps the whole team's info up to date automatically.
Your Project Access
You'll only see jobs, equipment, and stock for the project(s) you're actually assigned to โ that's deliberate, not a sync issue. If an asset, part, or past log looks like it's missing, it's most likely just not on your assigned project list yet โ check with your supervisor rather than assuming something's broken.
Logging a Visit
Tap + NEW RECORD ENTRY. Fill in the project, asset(s) worked on, hours, fuel readings, and any comments. If there's a fault, add the details and repair action โ this also pushes an instant alert to the team, with photos attached if you added any. Photos are optional on every entry, up to 3 โ tap to choose from your camera or photo library, and each one's automatically resized before saving so it doesn't eat your storage. Clone Last Entry pulls forward everything from your last visit to that asset so routine checks don't mean retyping model numbers each time. Entries save offline instantly โ no signal needed. Once saved, tap any entry to view it โ Edit, Clone, Send via Email, and Download PDF are all one tap away from there, and tapping any photo opens the full original in Drive if you need to zoom in or download it directly.
Commissioning Reports
Tap ๐ NEW COMMISSIONING REPORT for a full sign-off document when an asset first goes live โ header details, asset identification, live readings, and the complete pre-start and electrical checklists, matching your standard paperwork. Enter a Project and a Location or Generator Serial and known details (model, fuel tank ID, etc.) auto-fill from what's already on file where possible. Every completed report shows up in its own Commissioning Reports list on the dashboard (gold badge, so it's never confused with a regular log), and from there you get the same Edit, Clone, Send via Email, and Download PDF options as a regular entry.
Daily Status Update
Tap ๐ DAILY STATUS UPDATE for a fast way to check in on a whole project at once โ status notes, fuel, or hours across every asset, without a full log entry for each one. Fine to do even when you're not on site, e.g. estimating fuel or hours from known burn rates while Livelink/comms are down โ you'll always be asked whether a fuel or hours reading is Confirmed or an Estimate, so it's clear how reliable a number is. Tap โ Finish Daily Update when done โ it saves a full snapshot of every asset on that project, not just what you changed, so whoever reviews it later sees the complete picture with the ones you actually touched clearly marked. Shows up in its own Daily Updates list on the dashboard (indigo badge). This is separate from the Telegram /digest command further down โ that's a quick text summary, not a saved record.
Project Notes
Tap ๐ PROJECT NOTES for a running log of quick comments on a project โ a call with the customer, a heads-up for whoever's on site next, anything worth a record without a full log entry. Pick the project, type your note, and tap Save Note โ it's stamped with the date, time, and your name automatically the moment you save it.
Equipment Status & Fuel
Open Equipment to see every asset's status (OK/Due/Overdue) and location. Tap โ๏ธ Update Status on any card to flag something without doing a full log entry (e.g. "Refuel due," "No comms โ Attend"). For fuel tanks, tap โฝ Update Fuel %, and for gensets, tap โฑ๏ธ Update Hours โ both ask whether it's a Confirmed reading (Livelink/comms) or an Estimate, so everyone knows how reliable the number is. Under 10% fuel shows Critical, 10โ20% shows Low. Tap ๐ Move if an asset's been relocated to a different tower. If a brand-new asset isn't on the list yet, tap โ ADD NEW ASSET to register it yourself โ model, ID, and location if known โ rather than waiting on someone else to add it.
Demobilising Equipment
When something actually leaves a project for good, tap ๐ซ Demobilise on its card (or the ๐ซ icon in table view) โ don't just leave it sitting there. This properly removes it from the active list and logs it, with today's date and who did it, to Demobilised History (the button next to Due/Overdue Only in the Equipment section). This is a bigger step than a status update โ you'll be asked to confirm, and it's not something to undo casually. You can view or Print/PDF the full demobilised history any time, per project.
Parts & Stock
Parts used during a log automatically come off stock โ no separate entry needed. If something's running low, use Flag Low Stock to alert the team. Stock Check is for a full physical count against what's on file. If a part isn't showing up for your project yet, tap โ ADD NEW PART โ enter the part number first, and if it's already known under a different project, its description and model auto-fill and lock, so the same part never ends up listed two different ways across projects.
Manuals & Fault Codes
Browse Technical Manuals by folder for genset/DSE/AVR documentation and procedures. Fault Codes gives a quick troubleshooting reference by system.
Working Offline
Everything works with no signal. Pending Sync at the top shows how many entries are waiting to upload. Tap Force Sync Cloud Data any time you want to push/pull manually. Wipe Cache clears local view history only โ it won't let you run it if you have unsynced entries, so you can't lose work by accident. The app also checks for updates on its own and applies them automatically once it's safe to โ you might occasionally notice a brief "new version ready" banner or see it refresh itself; that's expected, and it's built to never happen while you're actively filling in a form.
Telegram Group
If you're in the team's Telegram alerts group, you can also type these directly:
/status <assetID> โ one asset's hours/fuel/notes /due โ everything due or overdue /fuel โ tanks low or critical /pending โ recent stock flags /digest โ run the daily summary now (a quick text digest โ separate from the in-app Daily Status Update above)
๐
๐
Demobilised Equipment
Asset Search
๐
๐ Commissioning Reports
๐ Daily Updates
VERSION 2.1
NEW ACTIVITY ENTRY
โ๏ธ Editing this entry. Date, Time On, and Genset ID are locked while editing โ they identify which record gets updated, so changing them would create a duplicate instead of fixing this one.
STOCK CHECK
โ
Stock check saved
โก MUIR GEN PRO
Generator Service Report
ASSET SUMMARY
Logged Details
๐จ Defect / Breakdown Logged
Notification Info:
Diagnostics & Actions:
Spares Used:
๐ง Maintenance Counter
SERVICE AT:
NEXT DUE (+500 hrs):
Parts / Consumables Used:
Checklist Results:
๐ฌ Insulation Resistance Test
ASSET:
TEST VOLTAGE:
AMBIENT TEMP:
INSTRUMENT:
Test Points:
Notes:
Project
Location
Genset
Powerpack
Fuel Tank
Time Slot
Run Hours
Technician
Performance Checks
Running On Arrival
Running On Depart
Oil Pressure
Charge Voltage
Engine Temp
Leaks Present
Fluids & Fuel Logs
Fuel Arrival
Fuel Bunkered
Fuel Departure
Oil Added
Coolant Added
General Shift Notes
Photos
Technician Signature
Date
๐ NEW COMMISSIONING REPORT
Header Information
Asset Identification
Live Operational Metrics
Pre-Start & Mechanical Checklist
0 of 0 items checked
Electrical Testing & Protection Settings
Main AC voltage output all combinations correct (L-L & L-N) โ adjusted to 415V output per phase
Main circuit breaker correctly set
Handover & Sign-off
โก MUIR GEN PRO
Generator Commissioning Report
Commissioning Report
Project
Location
Date
OEG Ref No.
Asset Identification
Generator Serial / MRE Asset No.
Model
Fuel Tank ID
Transformer ID
Engine Serial
Alternator Serial (data plate)
Run Hours
Live Operational Metrics
Fuel Level
Running Temperature
Oil Pressure
DC Charge Voltage
iRams / Live Link Serial
Pre-Start & Mechanical Checklist
Electrical Testing & Protection Settings
L1-L2
L2-L3
L3-L1
L1-N
L2-N
L3-N
Earth Leakage x1 (0.30mA setting)
Earth Leakage x5
Handover & Sign-off
Comments / Notes
Completed By
Engineer Signature
Date
๐ Daily Status Update
Quick project-wide check-in โ update status, fuel, or hours on any asset without a full log entry. Fine to do this even when you're not on site, e.g. estimating from known burn rates while Livelink/comms are down.
No changes yet this session
โก MUIR GEN PRO
Daily Status Update
Daily Status Update
๐ Project Notes
Quick, timestamped comments for a project โ a call with the customer, a heads-up for the next tech, anything worth a record without a full log entry.